32nd St and Crystal Green Lane Utility Work until Aug 28

Project Location

Along the east side of 32 Street between Crystal Green Way and Crystal Green Lane, including the intersection of Crystal Green Lane and 32 Street.
 

Type of Work

Extension of the sanitary trunk main, installation of a new manhole and completion of underground water and sanitary sewer utility connections required to support the Ridgemont Phase 1 development.

Schedule

  • Start Date: August 5, 2026
  • End Date: August 28, 2026
  • Hours: Monday to Saturday, 7 a.m. to 7 p.m.

Impacts 

  • 32 Street and the intersection at Crystal Green Lane will remain open to traffic during construction.
  • Traffic delays are expected, particularly during peak travel times.
  • Reduced speeds will be in effect near the construction area.
  • The sidewalk on the east side of 32 Street will be closed, with signed pedestrian detours in place.
  • Traffic and pedestrian detours may remain in place 24 hours a day, as required, throughout construction.
  • Access to properties along Crystal Green Lane will be maintained, with posted signage directing traffic via a gravel access road as needed.
  • Digital message boards, traffic-control measures and construction signage will help guide motorists and pedestrians through the area.
  • Direct driveway access for nearby residents is expected to remain available.

What to Expect

  • Construction crews, heavy equipment and increased noise during working hours.
  • Temporary traffic pattern changes and pedestrian detours throughout the work area.
  • Possible delays at nearby intersections and traffic signals.
  • Continued access for residents and properties in the area.
  • Please slow down, follow all posted signage and use extra caution when travelling through the construction zone.

Why This Work is Happening 

This work is required to extend the existing sanitary trunk main, install new utility infrastructure and connect the first phase of the Ridgemont subdivision to existing water, sanitary and storm sewer services.