Project Location
The intersection of 32 Street and Crystal Shores Road.
Type of Work
Developer-led connection of the sanitary trunk main, installation of a new manhole, and paving back to existing roadway.
Schedule
- Start Date: October 22, 2026
- End Date: October 27, 2026
- Hours: 7 a.m. to 7 p.m.
Impacts
- Expect major delays and large impacts to multiple directions of travel through the intersection:
- No southbound access on 32 St. at Crystal Shores Road (see detour map)
- No left turn onto Crystal Green Way
- No left turn onto Crystal Shores Road via northbound 32 St.
- No westbound access to Crystal Shores Road via Crystal Green Way
- Please follow alternate routes.
- Digital message boards, traffic-control measures and construction signage will help guide motorists and pedestrians through the area.
- Reduced speeds will be in effect near the construction area.
- Traffic and pedestrian detours may remain in place 24 hours a day, as required, throughout construction.
- Pedestrian detours are in place and clearly marked.
Image

What to Expect
- Major delays in travel through the area.
- Construction crews, heavy equipment and increased noise during working hours.
- Temporary traffic pattern changes and pedestrian detours throughout the work area.
- Flag people helping with traffic flow.
- Please slow down, follow all posted signage and use extra caution when travelling through the construction zone.
Why This Work is Happening
This work, managed by the developer, is required to extend the existing sanitary trunk main, and connect the first phase of the Ridgemont subdivision to existing Town sanitary service.
Developer Contact Information
Developer: Lamont Land
Bill MacDonald
Bill@lamontland.com
403-252-7575
Contractor: Borger
Kevin Quigg
Kquigg@borger.ca
403-279-7235
Engineering Consultant: CIMA+
Sean Popplewell
Sean.popplewell@cima.ca
403-775-0100