338 Avenue Functional Study & Detailed Concept Design

The Town's Transportation Master Plan identified 338 Avenue between Northridge Drive and Highway 2 will eventually require widening to four lanes. This project will prepare the functional study of 338 Avenue from Northridge Drive to Highway 2 (see image below). It will further develop into a detailed concept design for 338 Avenue from Northridge Drive to 32 Street to support land development between Northridge Drive and 32 Street currently in process.

Developing these concept designs will provide critical information to the adjacent land developers for their design process. Understanding the long-term vision for 338 Avenue will also ensure that interim designs minimize throwaway costs and that new infrastructure is installed in appropriate locations.